Free Construction Submittal Cover Sheet Generator & Template

Prepare a US Letter cover sheet for commercial MEP and subcontractor packages across Divisions 22, 23 and 26. Create your PDF without an account or start with a free editable Excel or Word template.

100% browser-local — your project data never leaves your browser.

Cover sheet details

Project & Party Info
Submittal Metadata
Submittal Type & Contents
Contractor Certification
Review Stamp

Live preview

US Letter · 8.5 × 11 in · 1 page

Excel (.xlsx) Word (.docx)
SUBMITTAL COVER SHEETProject & PartiesProject NameProject Number / Job #Project Address / LocationGeneral Contractor / OwnerArchitect / Engineer of RecordSubcontractor / Submitting FirmPrepared By (PM / PE Name)EmailPhoneSubmittal DetailsSubmittal NumberRevisionRev 0 - InitialDate SubmittedDate Required / Need-By DateCSI Spec SectionSpec Paragraph / Clause ReferenceDrawing ReferenceSubmittal ContentsSubmittal TypeItem Description / Equipment TagsManufacturer / SupplierContractor CertificationDeviation DeclarationSubcontractor Reviewer NameReview DateArchitect / Engineer / GC ReviewApproved / No Exceptions TakenApproved as Noted / Make Corrections NotedRevise and ResubmitRejectedReviewer SignatureDateCommentsGenerated with submittalprep.com

Building a Submittal Log from CSI Specs? Don't Copy-Paste by Hand.

A cover sheet handles one package. Upload a CSI Division 22, 23, or 26 spec section PDF (up to 30 pages) to get a page-cited PM checklist and a 22-column Procore import draft.

Build a submittal log

What Must Be on a Commercial Submittal Cover Sheet?

  • Match the log & Procore number

    Copy the assigned submittal number from the log or Procore into the cover and PDF filename. Keep the leading zeros, spaces, and suffixes used on the project so the reviewer can match the package to its record.

  • Cite the exact CSI section & paragraph

    Write the six-digit CSI section number and the clause that governs the item. Add the drawing sheet or detail number when it sets the requirement, so the reviewer can go straight to the source.

  • Track revisions on resubmittals

    Keep the original submittal number and increment the revision for each resubmittal. Record the issue date and identify which review comments you addressed so the team can trace the change and keep prior approvals on file.

  • List equipment tags & manufacturers

    Pair each equipment tag with its model and manufacturer, especially when a package includes multiple units. Name alternate suppliers next to the affected tag so procurement and field teams can check the selected equipment against the drawings.

  • Declare deviations up front

    Identify each deviation or proposed substitution on the cover, and state the affected requirement and why you are proposing the change. Cite the supporting page for dimensions, performance data, or a comparison to the specified product.

  • Leave dedicated review stamp space

    Reserve space for the GC and architect or engineer to record the review action, signature, date, and comments. Use the project’s required dispositions so the stamped cover can be routed with the approval record.

Need to assign the package numbers first? Build a submittal log from your CSI specs.

Submittal Cover Sheet FAQ

What is a construction submittal cover sheet?

A cover sheet is the first page of a submittal package. It identifies the project, assigned submittal number, revision, specification reference and contents. The contractor can disclose deviations on the cover and leave space for the reviewer’s disposition.

Is my project information uploaded to a server?

Your entries stay in the open browser tab. The preview updates locally, and the PDF is assembled on your device. The downloadable Excel and Word files are blank templates; downloading them sends none of your form values.

Does this cover sheet match CSI MasterFormat Division 22, 23, and 26?

Yes. You can enter any section from your project manual or start with presets for Division 22 Plumbing, Division 23 HVAC and Division 26 Electrical. Verify the exact section and paragraph numbers against the issued documents.

Can I download an editable Excel submittal cover sheet template?

Yes. The blank Excel workbook uses editable cells and is set up to print on a single US Letter page. An editable Word version is available beside it. Both files can be downloaded without an account.

How do I build a full Procore submittal log from a PDF spec book?

Open the SubmittalPrep workbench and start with the relevant MEP specification section. Review the extracted requirements against the cited pages and paragraphs, then export the Excel checklist and 22-column Procore import draft.